Quick Answer
CALGreen is Title 24 Part 11, not Title 24 Part 6. Part 6 is California's Energy Code; Part 11 is the California Green Building Standards Code. For a Los Angeles permit, CALGreen can require a separate green-building review and checklist covering water, waste, materials, indoor air quality, stormwater, cool roofs, and related measures. The City applies these requirements through the Los Angeles Green Building Code and LADBS review forms.
Green-building compliance is often described as if it were a single feature: solar panels, a high-efficiency heat pump, or a recycling plan. For a Los Angeles building permit, it is more accurate to think of CALGreen as a coordinated set of requirements that touches the site, the plans, the products, the construction sequence, and the closeout record.
CALGreen is the common name for the California Green Building Standards Code, Title 24, Part 11. It sits beside the Energy Code in Part 6. The two parts overlap in purpose, but they are not interchangeable. Part 6 is primarily about modeled and installed energy performance. Part 11 covers broader conservation and environmental-quality measures, including water use, construction waste, material resources, pollutant control, and certain site and parking features.
Los Angeles adds a local review layer through its Los Angeles Green Building Code and LADBS forms. That means a project can have a complete architectural plan set and still receive a correction because the green-building checklist is missing, a drawing does not identify the required measure, or the construction team has not established how documentation will be collected. This guide explains the difference between Part 6 and Part 11, when LADBS green-building review is triggered, what measures commonly matter, and how to keep compliance from becoming a late inspection problem.
CALGreen, Title 24 Part 11, and the Los Angeles Green Building Code
The official 2025 California Green Building Standards Code identifies CALGreen as Title 24, Part 11. The code contains mandatory measures and voluntary provisions, with application checklists identifying which requirements apply to different building types and scopes. The 2025 edition became effective January 1, 2026. Because code editions and local amendments change, a permit team should confirm the operative edition rather than copy an older checklist from another project.
Los Angeles implements the state framework through its own municipal code and LADBS process. LADBS explains that the Los Angeles Green Building Code is based on CALGreen and is intended to reduce energy and water use, reduce waste, and reduce the carbon footprint. Local forms give the plan checker and inspector a practical way to see where the required measure appears in the plans and how it will be verified.
The important distinction is operational: CALGreen is not just an optional sustainability statement in a project narrative. If a measure is mandatory for the scope, it belongs in the permit documents and in the construction record. The project may also pursue LEED, WELL, Passive House, or another private certification, but CALGreen compliance is a separate code obligation and should be managed separately.
Part 6 Energy Code vs. Part 11 CALGreen
The most common source of confusion is calling every Title 24 requirement “CALGreen.” A new Los Angeles home can need an energy model and solar analysis under Part 6 while also needing a Part 11 checklist for water fixtures, waste diversion, material choices, and other green-building measures. One consultant may coordinate both, or several specialists may divide the work, but the compliance records still need to agree with the architectural, mechanical, plumbing, electrical, and landscape drawings.
| Topic | Title 24 Part 6 | Title 24 Part 11 / CALGreen |
|---|---|---|
| Primary purpose | Energy use and building energy performance | Broader green-building measures and resource conservation |
| California code location | Title 24, Part 6 | Title 24, Part 11 |
| Typical subjects | Envelope, HVAC, water heating, lighting, solar PV, HERS verification | Water efficiency, construction waste, materials, indoor air quality, stormwater, cool roofs, site and parking measures |
| Common documentation | Energy model, CF1R/CF2R/CF3R, HERS records where required | Green Building Code checklist, plan notes, product information, waste records, inspection evidence |
| Los Angeles review | Energy documentation coordinated with the building permit | Separate green-building review for covered projects through LADBS |
| What it is not | A complete green-building certification | A substitute for LEED or another private certification program |
This is a planning comparison, not a substitute for the current code, local amendments, or project-specific checklist. For the energy side, see our Title 24 Part 6 compliance guide.
When Does LADBS Review CALGreen?
LADBS states that plans for new construction, additions or alterations that increase a building's conditioned volume, and alterations over the applicable valuation threshold are separately reviewed for green-building compliance. That description is more useful than trying to answer the question by project label alone. “Remodel” can mean a cosmetic interior refresh, a major addition, a systems replacement, or a commercial alteration with a substantial valuation. Each can have a different review path.
A new single-family home usually has the broadest design-stage coordination because the entire building is being created at once. An addition may trigger measures because it adds conditioned volume or crosses a scope threshold. A tenant improvement can involve green-building measures tied to the alteration and occupancy. A fire rebuild may be processed through an expedited or special program but still needs current-code screening. An ADU is new residential construction in many cases and should not be assumed to be outside Part 11.
The safest first step is a scope screen: identify the jurisdiction, occupancy, new versus existing construction, conditioned-volume change, valuation, demolition scope, site work, and utility work. Then match that scope to the current LADBS green-building form. The checklist should be selected before drawings are finalized, not after a plan checker asks why it was omitted.
Common CALGreen Measures in Los Angeles Projects
The exact checklist varies, but several subjects appear repeatedly in Los Angeles residential and commercial work. Water-conserving fixtures and plumbing design are common examples. The plumbing schedule, fixture specifications, and notes should identify the products that support the required flow rates or water-use performance. If the owner changes a fixture after plan approval, the team should check whether the change affects the compliance record.
Construction waste is another recurring requirement. The project must establish how concrete, wood, drywall, metal, cardboard, and other debris will be separated, reused, recycled, or hauled to an approved facility. The responsible party should keep receipts, weight tickets, facility records, and reuse documentation as work progresses. A permit expediter can track the administrative record, but the contractor and hauler need to produce accurate field records.
Material and indoor-environment measures can include low-pollutant adhesives, sealants, paints, coatings, carpet systems, composite wood, moisture management, and ventilation-related requirements. These provisions are not handled by one drawing alone. Specifications, product submittals, mechanical plans, and inspection notes may all contribute to the final record. The team should decide early where the evidence will live.
Site and exterior work can also matter. Depending on the project, the checklist may address stormwater drainage or retention during construction, grading and paving, bicycle parking, designated parking, cool roofs, solar-ready provisions, or landscape and irrigation efficiency. The relevant measure may live on a civil sheet, roof plan, landscape plan, plumbing plan, or construction detail rather than on the cover sheet.
This is why a generic “green” note is rarely enough. A plan checker needs to know which requirement is being satisfied, which sheet shows it, and what the contractor or inspector will verify. The best checklist is specific enough that someone outside the original design conversation can follow it through plan check and construction.
Water Efficiency, Fixtures, and Landscaping
Los Angeles projects have a practical reason to treat water efficiency as a design coordination issue rather than a final product selection. Fixture flow rates influence plumbing schedules and owner selections. Irrigation or landscape measures can affect site plans, equipment, backflow protection, and maintenance notes. A project that changes from a small landscaped yard to a larger irrigated area may need a new review of the assumptions used for the checklist.
For residential work, the design team should coordinate faucets, showerheads, toilets, appliances, hot-water distribution, and landscape decisions where applicable. For commercial or multifamily work, the fixture count, common areas, restaurant or laundry loads, irrigation zones, and cooling systems can make water-use coordination more involved. The green-building review is not a substitute for plumbing code review, but it gives the project an additional resource-conservation record.
Owners should also preserve product information. Keep cut sheets and approved substitutions with the closeout file, especially when a fixture is unavailable and a contractor proposes a replacement. A compliant substitute may be acceptable, but it should be documented rather than left to memory at final inspection.
Construction Waste and Material Documentation
Construction waste compliance begins before the first dumpster arrives. The project team should identify the waste-diversion target or method, list the anticipated material streams, and decide who will collect the records. Demolition and rebuild projects often have different streams from a ground-up project: concrete, masonry, metals, damaged framing, gypsum, roofing, and household contents may be handled by different contractors or programs.
The record should be usable. A single invoice marked “debris removal” may not show what facility received the material or how it was handled. Weight tickets, receipts, facility statements, reuse logs, and photographs can be more persuasive when they identify the material and destination. Establishing this system in the preconstruction meeting avoids a last-minute search through emails and credit-card statements.
Product documentation works the same way. Low-emitting materials, composite wood, roofing, insulation, plumbing fixtures, and mechanical equipment can have different evidence requirements. The architect or contractor should identify acceptable documentation in the specifications, and the permit coordinator should track changes that could create a mismatch with the approved checklist.
Stormwater, Cool Roofs, and Site Measures
Stormwater and site measures are easy to miss when the project conversation focuses only on the building. Grading, paving, drainage, retention, and construction-phase BMPs can involve LADBS, LA Sanitation, civil engineering, and the contractor. A pool, large addition, hillside grading project, or commercial site can also trigger separate stormwater or SUSMP questions beyond the CALGreen checklist. Our stormwater and LID guide covers that related permit coordination.
Cool-roof provisions can also be relevant to covered additions and alterations. The roof assembly, climate zone, slope, product rating, and project size can determine which requirement applies. A roof product selected for appearance should therefore be checked against both Part 6 energy assumptions and Part 11 or local green-building requirements. This is a typical example of why the energy consultant, architect, and roofing contractor need a shared record.
For a fire rebuild, exterior materials and site work may have additional wildfire, drainage, and access requirements. CALGreen does not replace Chapter 7A or other fire-safety rules. It is one layer of the project review, coordinated with the broader rebuild plan rather than treated as the only sustainability analysis.
From Plan Check to Final Inspection: What Must Stay Consistent
A green-building checklist is useful only when it remains connected to the approved plans and the actual construction. At plan check, the reviewer may ask where a particular measure appears, whether a selected product has the required performance, or why a checklist item is marked not applicable. The response should point to a specific drawing, schedule, specification, or project condition. Broad statements such as “contractor to comply with CALGreen” do not resolve a question when the code calls for a measurable fixture rate, identified roof product, material limit, or waste procedure.
During construction, substitutions are the most common way that consistency breaks down. A faucet, paint system, composite-wood cabinet, roofing product, ventilation fan, or paving material may be replaced because of cost or availability. The substitute can be perfectly acceptable, but the contractor should verify its documentation before installation and route any permit revision that is required. Installing first and asking later can create an inspection correction, removal of finished work, or a mismatch in the owner's final records.
Inspection timing matters as well. Some conditions are easiest to verify before they are concealed, and some records must be collected throughout the job. Waste tickets should be logged as loads leave the site. Product labels and cut sheets should be saved before packaging is discarded. Moisture-control, insulation, duct, and ventilation work may need coordination with other inspections or with Part 6 verification. A simple shared closeout folder, maintained from the start, is more reliable than asking every trade to reconstruct the history at the end.
Before final inspection, compare the approved checklist, correction responses, revised plans, installed products, and accumulated evidence. Confirm that outstanding deferred items have owners and that records required by LADBS or another agency are ready. This final reconciliation does not replace the inspector's judgment, but it can prevent a completed building from waiting on an administrative item that should have been tracked months earlier.
CALGreen and Fire Rebuilds in Pacific Palisades and Altadena
Owners rebuilding after the Palisades or Eaton fires often ask whether emergency procedures or a like-for-like rebuild remove current green-building obligations. The short answer is that a faster administrative pathway is not the same as a code exemption. The project still needs to be screened for the current Energy Code, CALGreen, wildfire construction, fire sprinklers, utilities, grading, and any coastal or land-use review that applies.
The practical sequence is to define the rebuild category, confirm the reviewing jurisdiction, identify which portions of the former structure are being reconstructed, and then coordinate the current code package. A replacement home may need Part 6 solar and energy documents, Part 11 green-building measures, Chapter 7A ignition-resistant assemblies, and a separate sprinkler permit. The fact that the floor plan resembles the former home does not make the new permit package identical to the old one.
Our Palisades and Altadena rebuild overview and like-for-like rebuild guide explain the broader procedural context. For the green-building side, bring the architect, energy consultant, civil or landscape designer, and contractor into the conversation before submittal so the checklist reflects real design decisions.
A CALGreen Permit Process That Avoids Late Corrections
CALGreen compliance is easiest to manage as a short sequence rather than a final paperwork sprint:
- 01
Screen the scope
Identify jurisdiction, occupancy, new or existing construction, conditioned-volume change, valuation, site work, and any rebuild or expedited program.
- 02
Select the current checklist
Use the current LADBS form for the project category and confirm the code edition and local amendments before completing the plans.
- 03
Coordinate the drawings
Place the green-building notes, fixture schedules, roof information, site measures, material requirements, and waste responsibilities on the sheets where they can be verified.
- 04
Submit a consistent package
Make sure the checklist references actual sheet numbers and that the energy, architectural, mechanical, plumbing, electrical, civil, and landscape documents agree.
- 05
Track construction evidence
Collect product data, waste records, delivery information, substitutions, and photographs as work proceeds rather than after the building is closed.
- 06
Close out with the record intact
Keep approved checklists, inspection sign-offs, receipts, and final product documentation together for the owner and future property records.
Why Work With a Permit Expediter on Green-Building Review?
The designer remains responsible for technical compliance, but the permit process still benefits from a coordinator who can see the whole package. A permit expediter can flag an absent checklist, compare the form to the drawing index, route plan-check comments to the right consultant, and track whether a revision affects energy, plumbing, roofing, site, or waste documentation.
Ocean Permits & Development is a women-owned Los Angeles permit expediting firm. We help owners, architects, and contractors coordinate LADBS submissions, corrections, inspections, and closeout across residential, commercial, ADU, and fire-rebuild projects. We can also connect the CALGreen review to the related Part 6 energy-code work, instead of treating the two code parts as unrelated reports.
A free consultation can clarify whether your project is likely to need a separate green-building review, what documents should be ready before plan check, and which other agencies may be involved. Call 213-277-8777 or use our contact page.
Frequently Asked Questions
1. What is CALGreen?
CALGreen is the common name for the California Green Building Standards Code, Title 24, Part 11. It is part of California's Building Standards Code and contains mandatory and voluntary green-building measures for residential, nonresidential, and other covered building work. The measures address subjects such as water efficiency, construction waste, materials, indoor environmental quality, and site-related resource conservation. CALGreen is not the same thing as a private LEED certification or a general marketing label for an efficient building.
2. Is CALGreen the same as Title 24 Part 6?
No. Title 24 Part 6 is California's Energy Code. It evaluates energy-related building features such as insulation, windows, HVAC, water heating, lighting, solar, and related compliance documentation. CALGreen is Title 24 Part 11 and covers a wider set of green-building topics, including water conservation, construction waste diversion, pollutant control, material conservation, and certain site measures. A project can need both Part 6 and Part 11 documentation.
3. Does every Los Angeles remodel need a CALGreen checklist?
No. The scope depends on the project type, valuation, conditioned-volume increase, occupancy, and the applicable Los Angeles Green Building Code provisions. LADBS states that new construction, additions or alterations that increase conditioned volume, and alterations over the applicable valuation threshold receive separate green-building review. A cosmetic repair is not analyzed like a new building or a large commercial alteration. The permit scope should be screened before assuming a checklist is or is not required.
4. What is the Los Angeles Green Building Code?
The Los Angeles Green Building Code is the City's local implementation of California's green-building standards, based on CALGreen and amended through the Los Angeles Municipal Code. LADBS reviews covered projects against the applicable state provisions and local amendments. The City has its own green-building forms and mandatory checklists, so a project team should not submit a generic statewide checklist without confirming that it matches the current City form and project category.
5. What green-building measures are common for a Los Angeles home?
Common measures can include water-conserving plumbing fixtures, efficient irrigation or landscape design where applicable, construction and demolition waste handling, low-pollutant materials, moisture and indoor-air-quality protections, cool-roof requirements for covered work, and required product or installation documentation. The exact list depends on whether the project is new residential construction, an addition, an alteration, an ADU, or a fire rebuild, as well as the code edition and local amendments in effect when the permit is reviewed.
6. Does CALGreen require solar panels?
Solar photovoltaic requirements primarily come from Title 24 Part 6, the Energy Code, rather than from CALGreen alone. CALGreen can include solar-ready or other related green-building measures for certain projects, and the two code parts must be coordinated. A new home or major addition may therefore have both an energy-code solar analysis and a separate green-building checklist. See our Title 24 Part 6 guide for the energy-documentation side of that question.
7. What does CALGreen require for construction waste?
Covered projects generally need a plan for diverting construction and demolition debris from landfill through reuse, recycling, or another approved method. The project team may need to identify a waste hauler or facility, keep weight tickets or receipts, document material reuse, and maintain records that support the percentage or method required by the applicable checklist. The exact documentation should be established before demolition or framing begins; trying to reconstruct it at final inspection is difficult.
8. Does CALGreen apply to a Pacific Palisades or Altadena fire rebuild?
A fire rebuild is not automatically exempt from current green-building standards. A replacement project must be evaluated under the permit scope and code provisions that apply when the new permit is submitted or issued, together with any local emergency or rebuild procedures. Like-for-like or expedited treatment can change the procedural path without eliminating health, safety, energy, or green-building requirements. The design team should screen Part 6 and Part 11 together at the start of the rebuild.
9. Who prepares the CALGreen checklist?
The architect, designer, engineer, contractor, or other responsible project professional typically completes the applicable checklist and identifies where each measure appears in the drawings or specifications. The permit expediter can coordinate the forms, check that the drawings and checklist agree, and track agency comments, but an expediter does not replace the licensed design professional responsible for technical design decisions or signed documents.
10. Can a CALGreen correction delay my permit?
Yes. A missing checklist, a plan note that does not match the selected fixture or roof product, unclear waste-diversion responsibility, or an omitted green-building detail can create a correction cycle just like a structural or mechanical omission. The delay is often avoidable because many measures are easier to document during design than after the permit is submitted. A coordinated pre-submittal review is especially valuable for additions, commercial tenant improvements, multifamily work, and fire rebuilds.
11. How does Ocean Permits help with CALGreen compliance?
Ocean Permits & Development coordinates the permit path among the owner, architect, engineers, contractors, energy consultant, and LADBS. We can identify which green-building forms are likely to apply, organize the submittal package, compare checklist references to the drawings, track plan-check comments, and keep waste, product, and inspection documentation moving toward closeout. We do not certify engineering or replace the responsible design professional; we keep the administrative and agency process aligned.