One Property · One Proposed Use · One Preliminary Assessment

Know the Property
Before You Commit

Before you sign the lease. Before you purchase the property. Before you invest in design and construction.

A property may look like the right opportunity—but zoning, permitted uses, permitting requirements, site conditions, entitlement requirements, or other project constraints can quickly change the economics and feasibility of your plans.

Ocean Permits provides a Preliminary Property Feasibility Study designed to help you identify potential risks, opportunities, and permitting considerations before making a major real-estate commitment.

Preliminary Study

$999

USD · Target 24-Hour Delivery

Start Your Study
Property plans, parcel research, and building model prepared for a preliminary feasibility study

From Preliminary Findings to an Issued Permit

A useful first review separates a site constraint from a missing document. For a Los Angeles City parcel, compare the proposed use with City Planning's ZIMAS parcel information and the approved building record. A real-estate listing, assessor description or former tenant's business license does not establish a legal occupancy. A restaurant proposed in a former shop, for example, can introduce exhaust, grease waste, electrical load, fixture counts and fire-review questions even where the floor area is unchanged.

We identify which questions can be screened from records and which need a licensed architect, engineer, surveyor or agency determination. Under LAMC sections 91.106 and 91.107, required construction permits and associated fees remain a separate process. Zoning must be checked against the applicable zoning code, overlays, specific plans and entitlement conditions; the preliminary review is not a substitute for a discretionary approval.

Decision stageUseful deliverableTiming / fee basis
Preliminary feasibilityKnown constraints, information gaps and recommended next steps$999 advertised study; target 24-hour delivery, subject to intake and confirmed scope
Records and consultant follow-upOccupancy history, survey, measured plans or engineering as neededAvailability-dependent; separately scoped professional work
Design and plan-check applicationCoordinated architectural, structural, MEP, energy and accessibility documentsDesign time plus agency queue; City plan-check fees separate
Corrections and clearancesResponses tied to sheets, calculations and outside-agency approvalsEach review cycle varies; entitlement or utility work may control
Issuance, construction and finalIssued permits, inspection milestones and occupancy closeout where requiredPermit fees, contractor work and inspection scheduling are separate

For LADBS work, plan-check acceptance is not permit issuance. The team must resolve corrections, complete required Planning, fire, utility or Public Works clearances, confirm fees and contractor information, and obtain the actual permit before construction starts. During construction, framing, structural connections, rough electrical, plumbing and mechanical work generally need inspection before concealment; final and any required occupancy approval come afterward. See LADBS's current services and inspection information for the applicable submission path.

Use our commercial tenant-improvement service for the construction approval stage, ADU permit coordination for residential additions, and the Certificate of Occupancy guide when the approved use is unclear. A food operator should compare the requirements for wholesale food production facilities with a retail restaurant before signing a lease. Properties in Gardena follow that City's process, not LADBS.

Feasibility Study Questions

Does a feasibility study guarantee that my permit will be approved?

No. The study is a preliminary review of one property and one proposed use, based on available records. The reviewing jurisdiction decides zoning and building compliance. A promising preliminary finding is not a permit, an entitlement, a structural certification, or permission to start work.

What should I provide before the study begins?

Provide the property address and parcel number if known, your intended operation or construction scope, available plans, prior permits and occupancy records, equipment information, and any lease or purchase deadline. Missing records are identified as information gaps rather than assumed to be approvals.

Is the $999 study price the same as a City permit fee?

No. The advertised $999 is the preliminary study service price. Agency plan-check and permit fees, architectural or engineering work, surveys, environmental studies, entitlement applications and construction are separate. Confirm the written scope and exclusions before ordering additional work.

What does target 24-hour delivery mean for a project?

The advertised delivery target concerns the preliminary study, not City plan check, agency responses or permit issuance. Missing information or records requiring outside research can affect what can be concluded. Confirm the intake requirements and project-specific delivery expectations before relying on a transaction deadline.

How does LADBS plan check follow a preliminary study?

After feasibility, the licensed design team develops drawings and calculations. LADBS reviews the submitted scope, issues corrections, and requires applicable outside clearances before permit issuance. Construction then needs the required rough, structural, trade and final inspections. These are separate stages, not tasks completed by the preliminary study.

Will a Los Angeles mailing address always mean LADBS is the authority?

No. Incorporated cities and unincorporated County parcels can have different building, zoning and fire authorities. We confirm the parcel jurisdiction before selecting the application path, because an approval from a neighboring city does not transfer.

The First Question

Ask “What will it take?”

Feasibility is the relationship between a specific property and a specific proposed use. We organize that first look around six connected questions:

01

Property

What is known about the parcel, building, site, records, and existing conditions?

02

Proposed Use

What do you intend to operate, build, renovate, or develop at this specific property?

03

Risks & Constraints

Which physical, regulatory, or jurisdiction-specific conditions could affect the plan?

04

Permit Path

Which preliminary approvals, agencies, and review tracks may be involved?

05

Red Flags

What appears unclear, potentially costly, or important enough to investigate before committing?

06

Next Steps

What should happen next to move from a first look into focused due diligence?

The result is a decision framework, not simply a report.

A Clear Preliminary Outcome

PURSUE

The preliminary findings indicate that the property appears suitable for further due diligence and project development.

RENEGOTIATE

Potential issues may affect the economics, lease terms, purchase price, tenant improvements, responsibilities, or other deal conditions.

REDESIGN

The proposed project may be viable with modifications to the intended use, scope, layout, occupancy, or development approach.

WALK AWAY

Significant preliminary constraints or risks may make the property unsuitable for the intended project.

Scope of Review

What We Preliminarily Evaluate

01

Property & Existing Conditions

  • Property identification
  • Available property records
  • Existing building/site information
  • Available plans and documentation
  • Basic site characteristics
  • Known property constraints

02

Zoning & Land Use

  • Zoning designation
  • General land-use requirements
  • Proposed-use compatibility
  • Potential use restrictions
  • Preliminary Change of Use considerations
  • Potential Conditional Use Permit or other discretionary approvals

03

Permitting & Approvals

  • Preliminary permitting pathway
  • Potential agency involvement
  • Planning considerations
  • Building considerations
  • Fire/life-safety considerations when applicable
  • Potential entitlement requirements

04

Potential Project Risks

  • Zoning or use restrictions
  • Parking
  • Access
  • Building limitations
  • Coastal considerations
  • Hillside/topographic conditions
  • Other jurisdiction-specific requirements

05

Red Flags & Information Gaps

  • What we know
  • What we don't know
  • What could become a problem
  • What requires additional investigation

06

Recommended Next Steps

  • Additional due diligence
  • Professional consultants
  • Jurisdictional meetings
  • Surveys
  • Engineering studies
  • Architectural analysis
  • Environmental investigations
  • Other services when appropriate

Recommended next steps may include additional due diligence, professional consultants, jurisdictional meetings, surveys, engineering studies, architectural analysis, environmental investigations, or other services.

Who Is This For?

Retailers & Tenants

Before signing a commercial lease, determine whether the space appears suitable for your intended business and what permitting or approval issues may need to be addressed.

Developers & Investors

Screen potential acquisition and development opportunities before committing substantial capital to detailed due diligence.

Property Buyers

Identify potential zoning, permitting, development, or property-related concerns before purchasing residential or commercial property.

Property Owners

Understand potential development opportunities and constraints before investing in design, construction, or redevelopment.

Business Owners

Evaluate a prospective location before committing to a long-term lease and tenant improvement investment.

Our Approach

From Property to Next Steps

  • 01

    Property

    We identify the property and organize the available records, plans, listing materials, and existing-condition information.

  • 02

    Proposed Use

    We define the business, occupancy, construction scope, or development concept you want the property to support.

  • 03

    Research

    We perform targeted preliminary research into zoning, land use, property records, permitting, and likely agency involvement.

  • 04

    Analyze

    We compare the property and proposed use to identify compatibility issues, constraints, information gaps, and material risks.

  • 05

    Decision Framework

    We organize the findings around a practical direction: pursue, renegotiate, redesign, or walk away.

  • 06

    Next Steps

    We identify the additional due diligence, consultants, meetings, or studies that should follow the preliminary assessment.

Faster First Look Before Full Due Diligence

Use the Preliminary Property Feasibility Study to identify the questions, constraints, and next steps that deserve attention before you commit to a lease, purchase, design contract, or construction budget.

Start Your Feasibility Study
Property Intake

Start Your Feasibility Study

The quality of the assessment depends on the quality of the information available. Share as much as you can now; no individual supporting document is required.

Supporting Documents (Optional)

Upload property listings or marketing packages, floor plans, site plans, photos, permits or property records, prior Certificates of Occupancy or building permits, and recent fire sprinkler, fire alarm, or fire-flow test reports.

For oversized files, email them directly to office@oceanpermits.com after submitting this form.

No payment is collected on this form. The $999 USD fee is arranged directly with our team after intake review. The target 24-hour delivery window begins once payment and complete property information have been received.

Call Us
Ocean Permits
Contact