Before you sign the lease. Before you purchase the property. Before you invest in design and construction.
A property may look like the right opportunity—but zoning, permitted uses, permitting requirements, site conditions, entitlement requirements, or other project constraints can quickly change the economics and feasibility of your plans.
Ocean Permits provides a Preliminary Property Feasibility Study designed to help you identify potential risks, opportunities, and permitting considerations before making a major real-estate commitment.

A useful first review separates a site constraint from a missing document. For a Los Angeles City parcel, compare the proposed use with City Planning's ZIMAS parcel information and the approved building record. A real-estate listing, assessor description or former tenant's business license does not establish a legal occupancy. A restaurant proposed in a former shop, for example, can introduce exhaust, grease waste, electrical load, fixture counts and fire-review questions even where the floor area is unchanged.
We identify which questions can be screened from records and which need a licensed architect, engineer, surveyor or agency determination. Under LAMC sections 91.106 and 91.107, required construction permits and associated fees remain a separate process. Zoning must be checked against the applicable zoning code, overlays, specific plans and entitlement conditions; the preliminary review is not a substitute for a discretionary approval.
| Decision stage | Useful deliverable | Timing / fee basis |
|---|---|---|
| Preliminary feasibility | Known constraints, information gaps and recommended next steps | $999 advertised study; target 24-hour delivery, subject to intake and confirmed scope |
| Records and consultant follow-up | Occupancy history, survey, measured plans or engineering as needed | Availability-dependent; separately scoped professional work |
| Design and plan-check application | Coordinated architectural, structural, MEP, energy and accessibility documents | Design time plus agency queue; City plan-check fees separate |
| Corrections and clearances | Responses tied to sheets, calculations and outside-agency approvals | Each review cycle varies; entitlement or utility work may control |
| Issuance, construction and final | Issued permits, inspection milestones and occupancy closeout where required | Permit fees, contractor work and inspection scheduling are separate |
For LADBS work, plan-check acceptance is not permit issuance. The team must resolve corrections, complete required Planning, fire, utility or Public Works clearances, confirm fees and contractor information, and obtain the actual permit before construction starts. During construction, framing, structural connections, rough electrical, plumbing and mechanical work generally need inspection before concealment; final and any required occupancy approval come afterward. See LADBS's current services and inspection information for the applicable submission path.
Use our commercial tenant-improvement service for the construction approval stage, ADU permit coordination for residential additions, and the Certificate of Occupancy guide when the approved use is unclear. A food operator should compare the requirements for wholesale food production facilities with a retail restaurant before signing a lease. Properties in Gardena follow that City's process, not LADBS.
No. The study is a preliminary review of one property and one proposed use, based on available records. The reviewing jurisdiction decides zoning and building compliance. A promising preliminary finding is not a permit, an entitlement, a structural certification, or permission to start work.
Provide the property address and parcel number if known, your intended operation or construction scope, available plans, prior permits and occupancy records, equipment information, and any lease or purchase deadline. Missing records are identified as information gaps rather than assumed to be approvals.
No. The advertised $999 is the preliminary study service price. Agency plan-check and permit fees, architectural or engineering work, surveys, environmental studies, entitlement applications and construction are separate. Confirm the written scope and exclusions before ordering additional work.
The advertised delivery target concerns the preliminary study, not City plan check, agency responses or permit issuance. Missing information or records requiring outside research can affect what can be concluded. Confirm the intake requirements and project-specific delivery expectations before relying on a transaction deadline.
After feasibility, the licensed design team develops drawings and calculations. LADBS reviews the submitted scope, issues corrections, and requires applicable outside clearances before permit issuance. Construction then needs the required rough, structural, trade and final inspections. These are separate stages, not tasks completed by the preliminary study.
No. Incorporated cities and unincorporated County parcels can have different building, zoning and fire authorities. We confirm the parcel jurisdiction before selecting the application path, because an approval from a neighboring city does not transfer.
Feasibility is the relationship between a specific property and a specific proposed use. We organize that first look around six connected questions:
01
What is known about the parcel, building, site, records, and existing conditions?
02
What do you intend to operate, build, renovate, or develop at this specific property?
03
Which physical, regulatory, or jurisdiction-specific conditions could affect the plan?
04
Which preliminary approvals, agencies, and review tracks may be involved?
05
What appears unclear, potentially costly, or important enough to investigate before committing?
06
What should happen next to move from a first look into focused due diligence?
The result is a decision framework, not simply a report.
The preliminary findings indicate that the property appears suitable for further due diligence and project development.
Potential issues may affect the economics, lease terms, purchase price, tenant improvements, responsibilities, or other deal conditions.
The proposed project may be viable with modifications to the intended use, scope, layout, occupancy, or development approach.
Significant preliminary constraints or risks may make the property unsuitable for the intended project.
01
02
03
04
05
06
Recommended next steps may include additional due diligence, professional consultants, jurisdictional meetings, surveys, engineering studies, architectural analysis, environmental investigations, or other services.
Before signing a commercial lease, determine whether the space appears suitable for your intended business and what permitting or approval issues may need to be addressed.
Screen potential acquisition and development opportunities before committing substantial capital to detailed due diligence.
Identify potential zoning, permitting, development, or property-related concerns before purchasing residential or commercial property.
Understand potential development opportunities and constraints before investing in design, construction, or redevelopment.
Evaluate a prospective location before committing to a long-term lease and tenant improvement investment.
We identify the property and organize the available records, plans, listing materials, and existing-condition information.
We define the business, occupancy, construction scope, or development concept you want the property to support.
We perform targeted preliminary research into zoning, land use, property records, permitting, and likely agency involvement.
We compare the property and proposed use to identify compatibility issues, constraints, information gaps, and material risks.
We organize the findings around a practical direction: pursue, renegotiate, redesign, or walk away.
We identify the additional due diligence, consultants, meetings, or studies that should follow the preliminary assessment.
Use the Preliminary Property Feasibility Study to identify the questions, constraints, and next steps that deserve attention before you commit to a lease, purchase, design contract, or construction budget.
Start Your Feasibility StudyThe quality of the assessment depends on the quality of the information available. Share as much as you can now; no individual supporting document is required.