Clear answers about the permit expediting process and how we operate.
Start with the parcel, not the mailing address. A San Fernando Valley address can belong to the City of Los Angeles, an independent city, or unincorporated County territory. Our City of San Fernando permit guide explains why that incorporated city uses its own Building and Safety Division rather than LADBS. For City of Los Angeles sites, check the permit history and ZIMAS parcel information before assuming a use, overlay or previous addition is approved.
For LADBS work, LAMC Section 91.106 establishes the permit framework and Section 91.107 addresses fees. The building application, any Planning entitlement and separately required trade permits are not interchangeable. A permit expediter coordinates the application and approval record; the architect, engineer and licensed contractor remain responsible for their designs and construction. We do not promise approval, bypass code requirements or replace the City's plan checker.
| Stage | Planning allowance | What must be resolved |
|---|---|---|
| Parcel and scope research | Several days to 2 weeks | Jurisdiction, existing permits, use, overlays, notices and the owner's complete project scope. |
| Design and application readiness | 2–8+ weeks | Coordinated drawings, structural calculations, energy forms and any required site investigations; complex design can take substantially longer. |
| Eligible express scope | Potentially same day after eligibility and documents are accepted | Only work that qualifies for the City's express route. A small project is not automatically eligible. |
| Standard plan check and corrections | Several weeks to several months | Review queue, corrections, designer responses and required building, planning, fire or other clearances. |
| Permit issuance | After all issuance conditions are satisfied | Approved sheets, required signatures, contractor or owner-builder documentation and assessed fees. |
| Construction and final inspections | Linked to the construction schedule | Call for required inspections before covering work; obtain finals and any required occupancy authorization. |
Keep four amounts separate: government plan-check and permit charges; outside-agency or utility charges; design, engineering and testing; and Ocean Permits' written coordination proposal. LADBS charges depend on valuation and scope under its official fee schedules. An independent city's fees are not calculated by copying a Los Angeles estimate. Additional reviews, changes after approval and reinspection can add costs. No number on this page is an Ocean Permits price quote.
A useful consultation package includes the address and parcel number, existing plans and permit records, proposed scope, construction valuation, any enforcement notice, and the desired opening or move-in date. For complicated scopes, our permit feasibility study identifies review dependencies before design spending increases. A stable or riding arena, for example, needs the use and grading analysis described in our equestrian facility permitting service, not just a small accessory-building application.
During plan check, maintain one correction log with the reviewer comment, responsible designer, response and next submittal date. Reconcile revisions across the architectural, structural and trade sheets before sending them back. For a commercial opening, review tenant improvement permit coordination and the certificate of occupancy guide; approved drawings do not, by themselves, authorize occupancy.
Our team is ready to discuss the specific requirements of your project.