Unpermitted construction and LADBS compliance orders can block sales, refinancing, and future improvements. We resolve them with a clear, structured legalization process — and honest advice about your options before you spend money on plans.
Code violations are more common than most property owners realize. Previous owners, contractors, or tenants often made modifications without permits — from garage conversions to electrical upgrades to room additions. These violations don't disappear quietly; they surface during sale, refinancing, or a neighbor's complaint, and they must be addressed before they compound into larger enforcement actions or derail a transaction.
Ocean Permits & Development assesses the existing conditions honestly, determines the correct permit pathway, coordinates with LADBS plan checkers and inspectors, and guides the project through to final sign-off. We resolve violations; we don't help avoid them.
Rooms, bonus spaces, or enclosed patios constructed without permits. Often discovered during sale or refinancing when a lender orders an appraisal that flags the square footage discrepancy.
Garage or storage space converted to living space without permits — one of the most common violations in Los Angeles. California law now makes legalization of many garage conversions straightforward, but the process still requires a permit.
Structures built too close to property lines, over easements, or encroaching on neighbors' properties. Legalization may require a variance; demolition may be required if the structure is not legalizable.
Operating a business in a space that isn't permitted for that use — or a building being used for a purpose that differs from its Certificate of Occupancy.
Unpermitted panel upgrades, additional circuits, or plumbing modifications flagged during inspection, escrow, or by a neighbor complaint. Often straightforward to legalize with the right documentation.
Formal notices from LADBS or LAHD requiring corrective action within a specific timeframe. Unaddressed compliance orders can escalate to penalties, liens, and in extreme cases, abatement actions.
Violation Assessment
We review the LADBS compliance order or violation notice, research the property's full permit history through LADBS records, and conduct a physical or document assessment of the existing construction against current code. This tells us whether legalization is straightforward, requires upgrades, or faces structural barriers.
Feasibility Report
Before you invest in drawings or plans, we give you an honest picture: what can be legalized as-is, what needs to be upgraded to meet current code, whether any element is not legalizable, and what the realistic cost and timeline looks like. Many property owners come to us having already spent money on plans for a path that wasn't viable.
Permit Application Preparation
We coordinate with your architect or engineer to prepare a compliant after-the-fact permit package — or, for simpler projects, prepare the documentation ourselves. Every submittal is reviewed against LADBS's specific requirements for retroactive permits before it's filed.
LADBS Plan Check & Corrections
We submit, track the application, and respond directly to plan checker comments. Retroactive permit applications often receive more scrutiny than standard new permits — we understand the specific code compliance questions these projects face and respond accordingly.
Inspection Coordination
We prepare an inspection sequence for your contractor that covers any required corrective work — wall openings for inspection, documentation of existing conditions, and confirmation of compliance — before the final sign-off inspection. Inspections that fail cost time; we prepare to pass.
Property sale
In California, sellers must disclose known material defects. Most lenders won't finance properties with active compliance orders. Resolving violations before listing protects your sale price and prevents last-minute deal collapses.
Refinancing
Lenders require a clean title and compliant improvements. Unpermitted additions that don't appear in appraisal calculations can affect loan-to-value ratios and trigger lender requirements for resolution.
Future improvements
LADBS will not issue new permits for a property with an active compliance order. If you want to add a deck, remodel a kitchen, or convert a garage legally, the existing violation must be cleared first.
Insurance claims
Unpermitted structures may be excluded from homeowner's insurance coverage. In fire-rebuild situations — increasingly common in Los Angeles — properties with unpermitted additions have faced coverage disputes.
Estate planning & transfer
Transferring property with unresolved violations can complicate title, affect assessed value, and create liability for heirs who inherit the compliance obligation.
A code violation permit — sometimes called a retroactive permit or after-the-fact permit — legalizes construction or modifications that were done without required building permits. Rather than demolishing the unpermitted work, this process brings it up to current code standards and records it with the city. The result is a legal, permitted structure with a clear permit history.
Code violations are most commonly discovered during real estate escrow (title search or buyer inspection), refinancing (lender-required inspection), a neighbor complaint triggering an LADBS inspection, or a routine city inspection of adjacent permitted work. LADBS issues a Compliance Order or Notice to Comply, which specifies what must be corrected and by when. You can also check your property's permit history and active violations directly on the LADBS website.
In most cases, yes — but not always. If the existing construction violates current zoning laws (e.g., a structure built within a required setback), legalization may require a variance or the structure may need to be removed. Construction that doesn't meet current structural or life-safety standards may require upgrades. We assess the existing conditions first and give you an honest picture of your options before you invest in a legalization effort that may not be feasible.
In California, sellers must disclose known material defects — including unpermitted additions — to buyers. While technically a sale can close with violations disclosed, most lenders will not finance a property with active LADBS compliance orders, and most buyers will require resolution as a condition of sale. Resolving violations before listing protects your sale price, prevents last-minute deal delays, and removes a negotiating point for buyers seeking price reductions.
Timeline depends on the scope of the violation and how much work is needed to bring the structure up to code. Simple violations with existing permitted structures can be resolved in 4–8 weeks. Complex violations requiring structural upgrades, new drawings from a licensed engineer, or a variance for a setback encroachment may take 3–6 months. We provide a realistic timeline estimate after reviewing your specific situation — not a generic range.
Permit fees for retroactive permits are typically calculated the same way as standard building permits — based on valuation of the work being legalized. In some cases, late-filing penalties may apply. The bigger cost is usually the design work (if new plans are required from a licensed architect or engineer) and any construction needed to bring the existing work up to code. We give you a clear picture of all expected costs during our initial feasibility assessment.
Tell us about the violation and we will assess your options before you spend a dollar on plans or drawings.
Get a Free Assessment